Kitchen Ceiling Replacement & Plasterboard Re-Skim by a Plasterer in Lewisham

Lewisham, London 2 days £650–£950
New plasterboard fixed to kitchen ceiling joists in Lewisham with downlighter aperture cut out and scrim tape visible on board joints
New 12.5mm plasterboard screw-fixed to kitchen ceiling joists with scrim tape applied to all board joints prior to skim coat — Lewisham SE13
Kitchen ceiling stripped back to bare timber joists in Lewisham SE13 with electrical cables exposed and kitchen units sheeted in polythene prior to re-boarding
Original lath and plaster ceiling fully removed, exposing the timber joist structure and rewire cabling — kitchen protected with polythene sheeting throughout
Completed skimmed kitchen ceiling in Lewisham after full plasterboard replacement showing flat multi-finish surface with four recessed downlighter positions
Freshly skimmed kitchen ceiling after full plasterboard replacement, showing a flat, closed multi-finish surface with recessed downlighter positions ready for electrical second-fix

Borough

Lewisham

Service

Full House Re-skim

Duration

2 days

Approx Cost

£650–£950

Property Overview

This project took place in a Victorian terraced house in Lewisham, SE13. The property had an older-style kitchen that had been partially modernised with fitted grey shaker-style units, an integrated oven and a stainless steel extractor. Despite the updated fittings, the original lath and plaster ceiling above the kitchen had deteriorated to the point where it could no longer be retained. The kitchen ran the full depth of the rear of the house, making it a sizeable ceiling area requiring a complete replacement rather than a patch or overboard solution.

The Problem

When our team first assessed the kitchen ceiling, it was clear the existing lath and plaster structure had failed. Image two shows the ceiling fully stripped back, revealing the original timber joists and the underside of the floorboards above. Exposed electrical cables were running between the joists — evidence of a recent rewire — and sections of old lath were still nailed across the underside of the joists in a crumbling, unusable state. The perimeter of the ceiling showed remnants of old plaster keys that had completely separated from the substrate. No section of the existing ceiling could be retained, and the full span from wall to wall required new plasterboard before any skim coat could be applied.

Inspection & Scope of Work

The full scope of work involved stripping the remaining lath and plaster from all ceiling joists across the kitchen, clearing all debris, and then cutting and fixing new plasterboard sheets directly to the exposed joists before finishing with a two-coat skim. Specifically, the work included: removing all remaining sections of original lath and loose plaster key from the joist faces; co-ordinating with the client's electrician to ensure all cables were correctly routed and positioned through the ceiling void prior to boarding; cutting 12.5mm plasterboard sheets to size and screw-fixing them at 150mm centres into the joists across the full ceiling area; taping all board joints with scrim tape before applying a bonding scratch coat to the entire ceiling surface; allowing the bonding coat to partially set before applying a finish coat of multi-finish plaster, worked back with a clean steel trowel to a flat, paint-ready surface; forming a recessed downlighter aperture visible in the finished image, with the back box left clear for the electrician to complete final connections. The walls in the kitchen were in an acceptable condition and were not re-skimmed as part of this contract — the scope was ceiling-only.

Preparation Work

Before any plasterboard was lifted into position, the kitchen units, worktops, appliances and floor were fully sheeted in heavy-duty polythene, sealed at the edges with blue masking tape — as clearly visible in image two. A plasterer's hop-up step and an aluminium trestle were set up to provide safe working height across the ceiling. All joist faces were checked for level, and any low points were packed out before boarding began. The electrical cables running between joists were carefully gathered and temporarily secured to avoid being trapped behind the new boards. A PVA bonding solution was applied to the face of the new plasterboard sheets prior to skimming to reduce suction and extend the working time of the multi-finish plaster.

Step-by-Step Plastering Process

With the new 12.5mm plasterboard fixed securely across the full ceiling span, the plastering process began with scrim tape applied along every board joint to prevent the skim coat from cracking at the seams. A bonding scratch coat was then applied across the entire ceiling surface, working in sections to maintain a wet edge. This scratch coat was ruled off and left to firm up before the finish coat of Thistle multi-finish was applied. The finish coat was spread at an even thickness of approximately 2–3mm using a wide steel plastering trowel, then laid off in long, overlapping strokes to pull the surface flat. As the plaster began to set, the ceiling was trowelled back with a damp brush and steel trowel to close the surface and remove any trowel marks. The recessed downlighter positions — four visible in the finished image — were kept clear throughout. The finished ceiling, captured in image three under warm ambient light, shows a flat, closed surface with no visible joints, ready for mist coat and decoration.

Challenges Encountered

The primary challenge on this job was the volume of exposed electrical cabling running freely between the joists when the old ceiling was stripped out. The cables needed to be managed carefully during the boarding stage to avoid being buried or pinched behind the new plasterboard. Working around live and dead cable runs in a functioning kitchen — with units and appliances already in situ — required careful coordination. Additionally, the kitchen ceiling spanned a long, narrow room, which meant the plasterboard sheets had to be supported overhead for extended periods while being fixed into position, requiring two operatives working together throughout the boarding stage.

Our Solution

Prior to any plasterboard being fixed, our team worked through each joist bay to identify every cable run and ensure each one was either fed through the correct knockout in the new board or left accessible at the point where a downlighter back box or pendant drop was required. Cables that needed to pass through the boards were measured and dropped through pre-drilled holes before the sheets were offered up. The two-man team worked in tandem — one supporting the board at height while the other drove screws at 150mm centres into each joist. This approach allowed the ceiling to be boarded efficiently without any cables being trapped, leaving the electrician able to complete their second-fix connections cleanly once the plaster had dried.

The Finished Result

Image three shows the completed kitchen ceiling after skimming and initial drying. The new plasterboard ceiling runs flat from wall to wall with no visible board joints, no cracking and no variation in level. Four recessed downlighter apertures are positioned evenly across the ceiling with clean, circular cut-outs ready for the electrician. The pendant drop point is left with cables hanging clear at the centre of the room. The walls, protected throughout by dust sheets, required no remedial work once the ceiling was complete. The finished ceiling was left to cure fully before the client's decorator applied a diluted mist coat as a primer.

Client Outcome

The client was able to hand the kitchen back to their electrician for second-fix downlighter installation within three days of the plastering being completed. The ceiling dried evenly with no cracking at the joints or along the perimeter. Once the mist coat was applied by their decorator, the surface took paint uniformly with no suction variation. The client commented that the finished ceiling looked noticeably better than any of the other rooms in the house, which still had their original lath and plaster in place — and they have since requested a quote to replace the ceiling in the adjacent dining room.

Why Choose London Plastering Service

Replacing a kitchen ceiling above fitted units and live appliances is not a straightforward boarding job. The combination of existing electrical cabling, limited working access above the units and the need to maintain a level board plane across a long ceiling span means errors in boarding translate directly into a visibly uneven finished surface. Cutting corners on screw spacing or failing to tape joints before skimming will result in cracking along board seams within months of decoration. Using the correct 12.5mm board weight, fixing at the right centres into structural joists, and applying a proper two-coat plaster system ensures the ceiling performs correctly over the long term.

Cost Factors & Project Timeline

This full house re-skim project in Lewisham was completed in approximately 2 days. The estimated cost for this type of work typically ranges £650–£950, depending on the size of the area, condition of the existing substrate, and level of preparation required. As a victorian terraced house, the project required specific considerations for access, dust management, and surface preparation typical of this property type in Lewisham.

Materials Used

12.5mm British Gypsum tapered-edge plasterboard Thistle Multi-Finish plaster Thistle Bonding coat Fibreglass scrim tape PVA bonding agent Drywall screws 3.5mm x 38mm Heavy-duty polythene dust sheets Blue masking tape
"The lads stripped out what was left of the old ceiling, boarded the whole thing and had it skimmed within two days. They worked around the electrician's cables without any issues and sheeted everything up before they started so the units were completely clean underneath. The ceiling came out dead flat — no ridges, no cracks along the joints. Really straightforward from start to finish."

— Daniel R.

Frequently Asked Questions

How long does it take to replace and re-skim a kitchen ceiling in Lewisham?

A standard kitchen ceiling replacement — stripping the old material, fixing new plasterboard to the joists and applying a two-coat skim — typically takes two days for a kitchen of average size. The first day covers stripping and boarding; the second covers taping, scratch coat and finish coat. The plaster then needs a minimum of three to five days to dry fully before painting, depending on ventilation in the kitchen.

Do I need to remove my kitchen units before the ceiling can be replaced?

In most cases, no. Our team works around fitted kitchen units by fully sheeting all worktops, appliances and cabinet fronts in heavy-duty polythene before any stripping or plastering begins. This protects your kitchen from plaster dust and debris throughout the job. However, if the ceiling joists run directly above wall unit fixing points that need to be accessed, your plasterer will advise on whether any units need to be temporarily removed.

My electrician has already run new cables through the ceiling void — can you board around them?

Yes. This is a common situation in Lewisham properties where owners rewire before replastering. Before any boards go up, we identify all cable runs in each joist bay, measure drop-down positions for pendants and downlighters, and pre-drill the boards before offering them up. Cables are fed through cleanly so your electrician can complete their second-fix connections once the plaster is dry without needing to break into the new ceiling.

What type of plasterboard should be used for a kitchen ceiling replacement?

For a kitchen ceiling fixed directly to joists, we use 12.5mm tapered-edge plasterboard as standard. The tapered edges allow scrim tape and a bonding coat to be feathered in at the joints, which prevents the seam from printing through once the finish skim is applied. In kitchens close to a steam source, moisture-resistant board can be specified, though in most domestic kitchens with adequate ventilation, standard board with a correctly applied two-coat skim is sufficient.

How much does a kitchen ceiling replacement cost in Lewisham SE13?

For a typical kitchen in a Victorian terraced house in Lewisham or the surrounding SE13 area, a full ceiling replacement including stripping, plasterboard fixing and two-coat skim usually falls in the range of £650 to £950 depending on ceiling size, access difficulty and whether additional work such as coving or downlighter cutting is required. We provide free, itemised quotes before any work begins.

Our Plastering Services

Related Plastering Projects in London

If your kitchen ceiling is cracked, sagging or has been stripped back to the joists during a rewire, we can help. London Plastering Service covers Lewisham, SE13 and all surrounding SE postcodes. Call us today for a free no-obligation quote on ceiling replacement and re-skimming.

Call Now

Get a Free Quote

Fastest quote = WhatsApp photos. Form is optional.

Lightning Fast Response

We reply to all enquiries within 60 minutes

Free Site Visit

We'll assess your project at no cost

No Obligation

Receive your quote with zero pressure

Prefer WhatsApp?

Send Message on WhatsApp