Property Overview
This project took place at a Victorian terraced house in the RM8 area of Barking and Dagenham. The property was undergoing a full renovation prior to being re-let or owner-occupied. Multiple rooms across the ground floor had been stripped back — floors were bare concrete and the walls had been taken back to plaster or block ready for fresh skimming. The property showed clear signs of previous decorating layers and ageing plaster that had reached the end of its serviceable life.
The Problem
Across the rooms visible in the image, the walls had already been hacked back or the old painted plaster surface had been stripped, leaving a rough, uneven substrate ready for re-skimming. The hallway and adjoining room showed a uniform mid-skim coat applied — the characteristic terracotta-brown colour of freshly applied multi-finish plaster — indicating work was in progress. The floor was bare concrete scattered with plaster debris and drips, confirming active stripping and application work. Exposed wiring was visible at skirting level in one area, suggesting an electrical first-fix had recently been completed, requiring plaster channels to be filled before finishing. A yellow water container and cable reel were present, consistent with an active working site.
Inspection & Scope of Work
The scope of work covered a full house re-skim across multiple rooms on at least the ground floor of this Victorian terraced property in Barking and Dagenham. The visible rooms included a hallway, a front or rear reception room, and what appears to be a connecting space — all receiving fresh skim coats to walls. Key tasks included:
- Hacking off or preparing existing old plaster surfaces where blown or flaking
- Filling chased electrical channels following first-fix electrical work
- Applying a PVA bonding wash to stabilise porous or patchy wall substrates prior to skimming
- Applying a scratch coat of multi-finish across all prepared wall surfaces
- Trowelling up to a smooth finishing coat on all walls
- Working around door frames, window reveals, and plasterboard ceiling junctions
- Squaring up corners and reveals in the hallway and between rooms
- Managing the drying sequence across multiple rooms to avoid overworking wet plaster
The project was carried out on a Saturday, with a team working across multiple spaces simultaneously to meet a tight turnaround. Ceiling work in at least one room involved a plasterboard-lined ceiling visible through the doorway, suggesting overboarding or new plasterboard was installed as part of the broader renovation package.
Preparation Work
Before any skim coat was applied, the substrate across each room was assessed for porosity, adhesion, and stability. Any areas of loose or blown plaster were hacked back to a solid background. Chased channels from the electrical first-fix were filled with bonding compound and allowed to set fully before skimming commenced. All wall surfaces received a diluted PVA bonding wash — applied liberally and allowed to become tacky — to seal the porous background and promote adhesion of the multi-finish skim coat. Door frames and ceiling junctions were masked or protected. Floors were covered with dust sheets to protect against plaster splatter during application.
Step-by-Step Plastering Process
With surfaces prepped and PVA at the correct tack, the plastering team began applying multi-finish plaster across the walls using large plastering trowels, working room by room. The hallway walls were skimmed first given their narrow width and corner junctions, which required careful feathering to keep edges clean. A scratch coat was laid on, spread firmly into the background to establish full contact and an even base. This was allowed to partially set before the finishing coat was applied and trowelled smooth.
In the front reception room, visible through the doorway, the same process was followed — walls brought up to a consistent skim finish coat. The team managed the drying sequence carefully, returning to each room at the correct point in the set to tighten the surface with a clean dry trowel and achieve a flat, paint-ready face.
Electrical back-box positions had been pre-set flush with the wall surface so the skim could be taken directly over the surrounding area without proud edges. The transition between walls and the plasterboard ceiling line was trowelled cleanly to avoid ridging at the junction. By working as a coordinated team on a Saturday, the crew was able to cover substantial square meterage across multiple rooms in a single day, keeping the project on schedule for the overall property renovation timeline.
Challenges Encountered
A key challenge on this project was managing a full house re-skim across multiple interconnected rooms within a tight timeframe — evidenced by the Saturday working pattern. With electrical first-fix cables and back-boxes already set, the plasterer had to work carefully around all wiring to avoid damaging newly chased channels. The hallway presented a further challenge: its narrow layout and multiple door openings meant there were numerous reveals and internal corners to skim cleanly, all requiring precise trowel work to maintain straight edges without the benefit of large open wall runs.
Our Solution
A coordinated team approach allowed multiple rooms to be worked simultaneously, with one plasterer leading on application while others managed mixing, PVA preparation, and finishing. The hallway corners and door reveals were tackled with angle beads where necessary to give a crisp, straight edge that could be skimmed up to cleanly. Electrical channels were pre-filled a day prior, ensuring they were fully set and stable before the skim was applied over them. Careful sequencing of the rooms — starting with the hallway and moving into the larger reception room — allowed each surface to reach the correct set point before final trowelling, keeping the workflow efficient.
The Finished Result
At the point captured in the image, the re-skim was mid-way through completion — the hallway and connecting room walls were coated in a uniform fresh skim, the characteristic pink-brown tone of multi-finish plaster that has been applied but not yet fully dried to white. The surfaces showed even coverage across the walls with no visible trowel drag marks or hollow patches. Once fully dried and lightly sanded at any arris points, the walls would be ready for mist coat and decoration. The hallway corners and door reveals appeared straight and cleanly executed.
Client Outcome
The client — carrying out a full renovation of this terraced property in Barking and Dagenham — was able to keep the project on schedule thanks to the Saturday working arrangement. With all ground floor walls re-skimmed in a single day's work, the follow-on trades including decorators and floor fitters could proceed without delay. The fresh skim coat provided a stable, flat surface throughout, ready for mist coat priming once fully dried — typically 48 to 72 hours in a well-ventilated property.
Why Choose London Plastering Service
Re-skimming an entire house is not a one-person job, and the margin for error on a full renovation property is low — any poorly applied plaster will show immediately once painted. An experienced team with the right mixing ratios, trowel control, and knowledge of set times is essential across multiple rooms. Working around first-fix electrical installations and managing open corners and reveals requires precise technique. London Plastering Service has over ten years of experience on full house renovation projects across Barking and Dagenham and surrounding boroughs, ensuring every wall is brought to a flat, stable, paint-ready finish.
Cost Factors & Project Timeline
This full house re-skim project in Barking and Dagenham was completed in approximately 3 days. The estimated cost for this type of work typically ranges £1,800–£2,800, depending on the size of the area, condition of the existing substrate, and level of preparation required. As a victorian terraced house, the project required specific considerations for access, dust management, and surface preparation typical of this property type in Barking and Dagenham.
Materials Used
British Gypsum Multi-Finish plaster PVA bonding agent (diluted wash coat) Bonding compound (for filling electrical chase channels) Angle beads (for hallway corners and door reveals) Plasterers' trowels and feather-edge rules
"They turned up on a Saturday and got through the whole ground floor in one day — hallway, front room and through to the back. The walls are flat and the corners are straight. Exactly what I needed before the decorators came in."
— Marcus T.
Frequently Asked Questions
How long does a full house re-skim take in Barking and Dagenham?
The duration depends on the size of the property and number of rooms. A typical two-bedroom terraced house in the RM8 area — covering ground floor hallway, reception room, and kitchen walls — will usually take two to three days. Larger three or four-bedroom properties can take four to five days. Our team can also accommodate weekend working to keep renovation timelines on track.
Do I need to move out during a full house re-skim?
For a full house re-skim in Barking and Dagenham, we generally recommend vacating or staying in unaffected rooms where possible. Wet plaster produces moisture and some dust, and rooms need adequate ventilation to dry properly. If the property is empty — as is common in renovation projects — this is the ideal scenario. For occupied homes, we work room by room to minimise disruption.
Can plastering be done after the electrician has been in Barking and Dagenham?
Yes — and in fact this is the correct sequence. The electrician completes first-fix wiring, chasing channels and fitting back-boxes into the walls. The plasterer then fills all chased channels with bonding compound, allows them to fully set, and skims over the top. This ensures a flush, stable surface with no cracking along the chase lines once dry.
How much does a full house re-skim cost in Barking and Dagenham?
Costs vary based on property size, condition of existing walls, and access. For a mid-terrace in the RM8 area, a full ground floor re-skim typically ranges from £1,800 to £2,800. A full house including upstairs bedrooms and landing can range from £3,000 to £4,500. We provide free, itemised quotes before any work begins so there are no surprises.
How soon can I paint after a re-skim in Barking and Dagenham?
Fresh multi-finish plaster needs to dry fully before painting — typically 48 to 72 hours in a well-ventilated room during summer months, and up to five to seven days in winter or in poorly ventilated properties. You should always apply a diluted mist coat — usually 70% emulsion to 30% water — as the first coat onto new plaster to avoid paint peeling caused by the plaster drawing moisture from the paint.
What happens if my walls have old blown plaster before re-skimming?
Any areas of blown or delaminated plaster must be hacked off before a new skim coat is applied. Skimming over blown plaster will fail — the skim will crack and lift as the underlying material continues to move. Our plasterers in Barking and Dagenham assess all walls before skimming, hack off any unstable sections, and apply a bonding coat to the exposed background before re-skimming for a lasting result.
Do you offer weekend plastering in Barking and Dagenham?
Yes — London Plastering Service regularly works weekends across Barking and Dagenham and the wider RM postcode area to help clients meet renovation deadlines. Weekend availability is subject to scheduling, so we recommend booking in advance. Weekend rates may apply depending on the scope of work, but this will always be clearly outlined in your written quote.
Planning a full house re-skim in Barking and Dagenham or the surrounding RM8 area? London Plastering Service provides multi-room plastering packages for renovation and refurbishment projects of all sizes. Whether you need a single room or a whole house re-plastered, we can accommodate tight schedules including weekend working. Call us today for a free, no-obligation quote.
We use cookies to improve your experience, analyse site traffic and personalise advertising. By clicking "Accept All", you consent to our use of cookies. Read our Cookie Policy and Privacy Policy.