This project took place in a Victorian terraced house in Greenwich, SE10, South East London. The property features period-style architraves, panelled internal doors and original skirting boards consistent with late Victorian construction. The kitchen had been recently fitted with modern gloss units and integrated appliances, indicating the home was mid-renovation. Despite the updated kitchen fit-out, the walls throughout the property still carried the original plaster, which had deteriorated over decades and was no longer suitable for decorating without a full re-skim.
The Problem
The main image clearly shows a kitchen wall mid-skim, with a fresh wet coat of multi-finish plaster applied across a large expanse of wall above the kitchen units. The inset before-photo reveals the ceiling prior to work — a flat plasterboard surface with a visible access hatch and a small penetration hole, suggesting recent electrical or plumbing work had been carried out. Dust sheets and protective polythene sheeting are visible on the floor in the before shot, confirming the space was actively being prepared. The existing wall plaster was old painted plaster in poor decorative condition, uneven in places and not suitable for direct painting without a skim coat to restore the surface.
Inspection & Scope of Work
The scope of work covered a full house re-skim across multiple rooms in this Greenwich Victorian terrace, with the kitchen being one of the final rooms captured in progress. The work included:
- Re-skimming all walls throughout the property with a two-coat application of British Gypsum Multi-Finish plaster
- Skimming the kitchen walls above and around the newly fitted kitchen units, working carefully to the edges of the cabinets and around electrical back boxes
- Addressing the ceiling in at least one room, visible in the inset photo, which shows a plasterboard ceiling with an access hatch and a small hole from a previous fitting — both required patching and finishing flush before skimming
- Preparing and priming all surfaces prior to skim application, including PVA bonding of porous old painted plaster to prevent suction issues
- Filling and finishing around ceiling penetrations and recessed light positions
- Protecting the newly installed kitchen — units, worktops, appliances and flooring — with dust sheets and polythene throughout the works
The kitchen re-skim alone covered a substantial wall run, with the fresh brown multi-finish coat visible across the full height of the wall from worktop level to ceiling junction, indicating a complete re-skim rather than a patch repair.
Preparation Work
Prior to skimming, all surfaces were assessed for adhesion. The existing old painted plaster walls were treated with a diluted PVA bonding solution — typically one part PVA to four parts water — applied by brush and allowed to become tacky before plastering began. Any small holes from electrical chasing or fitting penetrations visible in the ceiling were filled with bonding coat and allowed to set. The access hatch in the ceiling was checked for structural security before the surrounding plasterboard was skimmed flush. Dust sheets and heavy-duty polythene were laid over the kitchen units, appliances and flooring to protect the finished fit-out from plaster splatter.
Step-by-Step Plastering Process
The plastering process followed a standard two-coat multi-finish application across all surfaces. In the kitchen, the plasterer worked from the top of the wall down, applying the first scratch coat of British Gypsum Multi-Finish at approximately 2–3mm thickness using a steel trowel. This coat was applied firmly to ensure full contact with the PVA-primed existing plaster beneath, eliminating any dry spots or delamination risk.
The scratch coat was left to firm up before the second finishing coat was applied over the top, again at 2–3mm. As the second coat began to stiffen, the plasterer worked the surface in long, sweeping trowel passes to consolidate the plaster and close the surface. A small amount of water was flicked onto the surface during the final trowelling stage to assist with burnishing and produce a smooth, flat finish ready for mist coat and decoration.
In the ceiling area visible in the before photo, the plasterboard surface was first spot-filled around the access hatch frame and the penetration hole using bonding coat, which was feathered flush with the surrounding board. Once fully set and dry, the entire ceiling received a skim coat of multi-finish applied in two passes, trowelled to a flat finish. Beads were checked at all external corners to ensure crisp, sharp arris lines at the wall-to-ceiling junction throughout the kitchen.
Challenges Encountered
The primary challenge on this project was working around a fully fitted and newly installed kitchen without causing damage to the units, worktops, appliances or tiled floor. Re-skimming a kitchen wall after cabinetry has already been installed requires careful cutting-in at the top of the wall units, behind the upstand and along the sides of the cabinets where the plaster meets the carcass. Any over-application of wet plaster in these tight junctions risks staining or damaging the units. The ceiling penetration and access hatch visible in the before photo also required careful bonding and feathering to avoid a raised patch once skimmed.
Our Solution
All kitchen units, the stainless steel appliance panel, worktops and the tiled floor were fully protected with heavy-duty dust sheets and taped polythene sheeting before any mixing began. The plasterer cut in carefully around the top of the wall units using a smaller leaf trowel, ensuring the skim coat sat flush against the cabinet tops without overlapping onto the finished surfaces. The ceiling penetration was filled in two stages — a bonding coat build-up followed by a thin skim — to bring the repaired area flush with the surrounding board before the full ceiling skim was applied. All edges were checked with a straight edge before the final trowelling pass.
The Finished Result
The finished kitchen wall shows a clean, flat, freshly skimmed surface in the characteristic warm brown tone of wet multi-finish plaster, ready for mist coat and final decoration. The skim coat runs continuously from the ceiling junction down to the top of the kitchen units, with no visible ridges, trowel lines or patchy areas in the photo. The white-painted ceiling and walls adjacent to the freshly skimmed surface provide a clear contrast that confirms the new skim is level and consistent. The ceiling access hatch area is finished flush with no raised patch visible, indicating a successful two-stage repair. The property is now ready for decoration throughout.
Client Outcome
Following the full house re-skim, the client had fresh, smooth plaster walls throughout their Greenwich Victorian terrace, ready to receive a mist coat and final decoration. The kitchen walls in particular were transformed — the previously rough, old painted plaster was replaced with a flat, consistent skim coat that sits cleanly around the newly installed units. With the re-skim complete, the client was able to progress immediately to the decoration stage, avoiding the delays and additional costs that come from attempting to paint directly onto deteriorated plaster.
Why Choose London Plastering Service
Re-skimming walls in an occupied or recently fitted kitchen is not a job for an inexperienced plasterer. Old painted plaster requires correct PVA priming — without it, the substrate draws moisture from the fresh skim coat too rapidly, causing the plaster to dry out unevenly and crack. Working around fitted kitchen units demands accurate cutting-in with a smaller trowel so that the skim finishes cleanly against the cabinet tops rather than bridging onto the carcasses. Incorrect water-to-plaster ratios or poor timing on the trowelling passes will result in drag marks and a surface that requires significant sanding before decoration. A correctly applied two-coat multi-finish skim eliminates these risks and produces a surface that accepts emulsion paint without additional filling.
Cost Factors & Project Timeline
This full house re-skim project in Greenwich was completed in approximately 5 days. The estimated cost for this type of work typically ranges £1,800–£2,800, depending on the size of the area, condition of the existing substrate, and level of preparation required. As a victorian terraced house, the project required specific considerations for access, dust management, and surface preparation typical of this property type in Greenwich.
"Really pleased with the work. The team was careful with our new kitchen — everything was covered up properly and there wasn't a mark on the units when they were done. The walls came out flat and even, which is exactly what we needed before painting. Would use them again for any future plastering work."
— Rachel T.
Frequently Asked Questions
How much does a full house re-skim cost in Greenwich?
The cost of a full house re-skim in Greenwich typically ranges from £1,800 to £3,500 depending on the number of rooms, ceiling heights, and the condition of the existing plaster. A two-bedroom Victorian terrace in SE10 would generally fall in the £1,800–£2,800 range. We always visit the property before quoting to assess the substrate condition and any prep work required.
Can walls be re-skimmed after a new kitchen has been fitted?
Yes, walls can be re-skimmed after kitchen units have been installed, but it requires careful preparation and experienced cutting-in around the cabinets. The plasterer needs to protect all units, worktops and appliances with dust sheets and polythene, and cut in accurately along the top of the wall units using a smaller trowel. This is a common scenario in Greenwich properties where kitchens are replaced but the walls still carry old plaster that needs refreshing before decorating.
Do old painted plaster walls need special preparation before re-skimming?
Yes. Old painted plaster is a low-suction surface, but it can also be porous in patches where the paint has failed. Before re-skimming, all walls should be treated with a diluted PVA bonding solution — typically one part PVA to four parts water — applied and left to become tacky. This stabilises the surface, controls suction and ensures the multi-finish skim coat bonds correctly. Skipping this step on old painted plaster in Victorian properties can lead to the skim coat drying too fast, cracking or delaminating.
How long does a full house re-skim take in a Victorian terrace in Greenwich?
A full house re-skim in a three or four-bedroom Victorian terrace in Greenwich typically takes between four and seven working days, depending on the number of rooms, the condition of the existing plaster and how much preparation work is required. Ceilings generally add time compared to wall-only skimming. The plaster will then need a minimum of four to six weeks to dry fully before painting with a mist coat of diluted emulsion.
How do I know if my walls need a full re-skim or just patch repairs?
If your walls have isolated cracks, small holes from rewiring or single damp patches, patch repairs may be sufficient. However, if the existing plaster is broadly uneven, has widespread hairline cracking, fails the tap test in multiple areas (hollow sound when knocked), or has been painted so many times the surface is beyond flat, a full re-skim is usually more cost-effective in the long run. Our plasterers can assess your Greenwich property and advise on the most practical and economical approach.
Can ceiling access hatches be plastered flush and skimmed over?
An access hatch frame itself should remain accessible, but the surrounding plasterboard can be re-skimmed flush up to the hatch frame. If there are gaps or rough edges around the hatch, these are filled with bonding coat in stages and feathered flush before the skim coat is applied. The result is a clean, flat ceiling with the hatch frame sitting neatly within the skimmed surface. This is standard practice on Victorian terraces in Greenwich where access hatches to loft spaces or plumbing voids are common.
What is the best time of year to get plastering done in Greenwich?
Plastering can be carried out year-round in Greenwich, but the drying conditions matter. Summer months with good ventilation allow multi-finish plaster to dry more evenly. In winter, it is important to maintain a consistent temperature above 5°C in the room and avoid drying plaster too quickly with direct heat, which can cause surface cracking. Regardless of season, freshly skimmed walls should be allowed to breathe — windows opened slightly during the day — and never force-dried with a dehumidifier or fan heater set too close to the surface.
If you're looking for a reliable plasterer in Greenwich or the wider SE10 area, London Plastering Service offers free no-obligation quotes for full house re-skims, wall skimming and ceiling repairs. Whether your property is mid-renovation or simply in need of fresh plaster before decorating, call us today or submit an enquiry online to arrange a visit.