Full House Re-skimRedbridge

Full House Re-skim & Lath Ceiling Replacement by a Plasterer in Redbridge

Redbridge, London 5 days £1,800–£2,800
Exposed timber laths and ceiling joists after lath and plaster removal in a Redbridge period property
Original lath boards fully stripped, exposing aged ceiling joists ready for new plasterboard in Redbridge
Freshly re-skimmed bedroom wall in drying phase showing multi-finish plaster in Redbridge IG1
Multi-finish skim coat applied to bedroom wall — surface shown transitioning from wet to dry in Redbridge IG1
New 12.5mm plasterboard fixed to ceiling joists with scrim tape on joints and mesh patch over void in Redbridge
New tapered-edge plasterboard screwed to joists with scrim tape bedded on all joints and a mesh patch over the cut-out void
Large lath and plaster wall collapse showing blown section with exposed timber battens before repair in Redbridge IG1
Significant lath and plaster blow-out exposing timber battens — the full void was cut back and boarded before re-skimming

Borough

Redbridge

Service

Full House Re-skim

Duration

5 days

Approx Cost

£1,800–£2,800

Property Overview

This project took place in a period property in Redbridge, IG1, in east London. The house retained much of its original construction fabric — including lath and plaster ceilings and walls with older lime-based render beneath more recent paint layers. Properties of this age across Redbridge frequently present multiple plastering challenges simultaneously: failing original ceilings, damaged plasterwork from renovations or water ingress, and walls that have degraded to the point where re-skimming alone is not sufficient. A full ceiling replacement and wall re-skim programme was needed across the property.

The Problem

The images reveal a property in poor decorative and structural condition across multiple rooms. Image one shows a ceiling with the lath and plaster finish fully stripped away, exposing raw timber laths fixed to original ceiling joists — the lath boards are dark with age and there is visible debris and residue from the removed plaster. Image four shows a dramatic large-section collapse in a wall or ceiling where the old lath and plaster has blown and fallen away, leaving a ragged hole exposing the timber battens beneath and cracked surrounding plaster. Image two shows a wall freshly re-skimmed with multi-finish plaster, still at the drying stage showing the characteristic pink-to-grey colour transition. Image three shows new plasterboard fixed to the ceiling with scrim tape applied across board joints and a mesh patch over a cut-out.

Inspection & Scope of Work

The scope of work on this Redbridge property covered two primary trades elements: full ceiling replacement where the original lath and plaster had either been removed or had collapsed, and a full wall re-skim programme throughout multiple rooms. Starting with the ceiling, the old lath boards were stripped back completely in the affected areas, leaving the original timber joists exposed and ready to receive new plasterboard. New 12.5mm tapered-edge plasterboard sheets were then measured, cut, and fixed directly to the ceiling joists using drywall screws at appropriate intervals. All board joints were covered with fibreglass scrim tape to prevent future cracking along the joints. A mesh self-adhesive patch was applied over a smaller cut-out void in the ceiling board. Metal stop bead was installed along the vertical edges of the new plasterboard to create a clean, defined arris. On the walls, the existing plaster surface — where still intact — was assessed for suction and adhesion. Where the surface was sufficiently stable, it was pre-treated with a diluted PVA bonding solution to control suction before skimming. The large blow-out section visible in image four required more substantial repair: the remaining loose and cracked plaster around the void was cut back to a clean edge, and the exposed lath was used as a substrate for the repair plasterboard patch before the entire wall surface was re-skimmed. Each wall received a scratch coat of British Gypsum multi-finish plaster followed by a tightened finishing coat to produce a flat surface ready for decoration.

Preparation Work

Before any plaster was applied, a full preparation programme was carried out. In the ceiling areas, all remaining lath and failing plaster was stripped and removed, and the joist faces were checked for level. Any nails or fixings left in the joists from the old lath were removed or punched flush. New plasterboard was fixed and all screw heads were set slightly below the board face. Scrim tape was embedded along every board joint and across the mesh repair patch. On the walls, loose plaster around the blown section was cut back cleanly using a bolster chisel to avoid further undermining the surrounding surface. All dust was brushed down and a coat of diluted PVA bonding agent was applied to the wall surfaces to regulate suction and promote adhesion of the multi-finish skim coat.

Step-by-Step Plastering Process

With preparation complete, the plastering process began on the new plasterboard ceiling. A bonding coat was not required on the tapered-edge plasterboard; instead, the scrimmed joints were spot-filled and allowed to set before the full skim coat was applied across the ceiling. Multi-finish plaster was mixed to a consistent creamy texture and applied in a firm, even scratch coat across the entire ceiling surface using a plastering trowel. This first coat was cross-hatched lightly to improve mechanical key for the second coat. Once the scratch coat had firmed to the correct consistency — firm to the touch but not fully set — the finishing coat was applied and trowelled up progressively tighter in passes, using a clean, dampened trowel to bring the surface to a flat, smooth finish ready for paint. On the walls, the process followed a similar two-coat approach. The large repair area was boarded, scrimmed, and spot-filled before being skimmed in with the surrounding wall surface so that no visible joint or ridge would remain. Each wall surface received a scratch coat of multi-finish followed by a tight finishing pass. Window reveals and wall edges were worked with an angle bead trowel to ensure crisp, straight returns. The finished plaster was left to dry naturally without forced heat to prevent premature surface cracking.

Challenges Encountered

The primary challenge on this Redbridge project was the large-scale ceiling failure and the significant wall blow-out visible in image four. The collapsed lath and plaster section left a jagged, irregular void with cracked and undermined plaster radiating outward from the hole. Simply patching over the damaged area would risk future cracking and differential movement at the patch boundary. The exposed lath substrate in the void was not flat or level with the surrounding wall surface, requiring careful build-up and boarding before the skim could be applied. Additionally, the age of the existing plasterwork on the surrounding walls meant suction levels were inconsistent — some areas were highly porous and others were non-absorbent due to old paint layers — making skim coat adhesion difficult to control without proper preparation.

Our Solution

To address the ceiling failure, all original lath was stripped from the affected ceiling areas and new 12.5mm plasterboard was fixed directly to the exposed joists, creating a stable, level substrate for skimming. Fibreglass scrim tape was applied to all joints and a self-adhesive mesh patch covered the cut-out void to prevent cracking at the repair boundaries. For the wall blow-out, the void was cut back to a clean edge and a plasterboard insert was fixed to the exposed lath battens to bring the repair flush with the wall surface. This was then scrimmed and skim-coated in with the surrounding wall. A diluted PVA wash was applied across all existing wall surfaces to equalise suction before the multi-finish skim was applied, ensuring consistent drying and adhesion across the entire surface.

The Finished Result

The completed work is clearly visible in image two, which shows a freshly re-skimmed wall surface in the drying phase — the multi-finish plaster is transitioning from its characteristic pink wet colour to an even, flat grey as it cures. The surface is uniform with no ridges, patch marks, or joint lines visible — the large repair area has been fully absorbed into the wall plane. The ceiling, now fully plasterboarded and scrimmed, was ready to receive a finishing skim coat to match the walls. The property rooms were transformed from visibly failing, crumbling lath and plaster surfaces into flat, stable, paint-ready walls and ceilings that will not require further structural attention for many years.

Client Outcome

The homeowner in Redbridge was left with structurally sound, fully re-skimmed walls and a replaced, plasterboarded ceiling throughout the affected rooms. The collapsed and crumbling areas that had made the property undecoratable were fully resolved, and the rooms were handed over clean and ready for the decorator to follow. The repair work — including the large wall blow-out — was fully integrated into the surrounding surfaces with no visible patching lines. The property is now ready for the next phase of its renovation programme.

Why Choose London Plastering Service

Lath and plaster ceiling replacements and large-section wall repairs in period properties require more than basic skimming ability. Plasterboard must be fixed correctly to the joists at the right centres, scrim tape must be embedded properly to prevent joint cracking, and repair inserts must be built up flush before skimming — otherwise the patch will telegraph through the final decoration. Controlling suction on aged walls is equally important: applying multi-finish to an unprepared porous surface causes the plaster to dry too quickly, resulting in a dragged, uneven finish. With over a decade of experience working on period properties across Redbridge and east London, London Plastering Service understands how to assess and treat each substrate correctly before any plaster is mixed.

Cost Factors & Project Timeline

This full house re-skim project in Redbridge was completed in approximately 5 days. The estimated cost for this type of work typically ranges £1,800–£2,800, depending on the size of the area, condition of the existing substrate, and level of preparation required. As a period property, the project required specific considerations for access, dust management, and surface preparation typical of this property type in Redbridge.

Materials Used

British Gypsum Multi-Finish plaster 12.5mm tapered-edge plasterboard Fibreglass scrim joint tape Self-adhesive mesh repair patch Metal stop bead / angle bead Drywall screws Diluted PVA bonding agent
"The team stripped out the old ceiling and replastered the whole lot — I was expecting the patch on the wall where it had all fallen away to be obvious but you genuinely cannot see where the repair is. The walls are completely flat and the ceiling is solid. Very happy with the result."

— Marcus T.

Frequently Asked Questions

How do I know if my lath and plaster ceiling in Redbridge needs full replacement or just a re-skim?

Press gently on the ceiling surface. If it moves, feels springy, or sounds hollow when tapped, the plaster has likely lost its key with the lath and will continue to fail. In most period properties in Redbridge, once a section begins to drop, neighbouring areas tend to follow. Full replacement with new plasterboard fixed to the joists is usually more cost-effective and longer-lasting than attempting to re-stabilise old lath and plaster across a large area.

How long does a full house re-skim with ceiling replacement take in an IG1 property?

A full house re-skim combined with ceiling replacement in a typical three-bedroom period property in Redbridge usually takes between four and six days. Ceiling replacement adds time because the plasterboard fixing and scrimming must be completed and the joints set before the skim coat can be applied. Drying time between coats also needs to be respected to avoid the finish coat lifting off the scratch coat.

Can a large hole in a lath and plaster wall be repaired invisibly, or does the whole wall need to be re-skimmed?

For a truly invisible repair, the entire wall surface should be re-skimmed after the patch is inserted. A plasterboard insert is fixed into the void, scrimmed at the edges, and then the full wall receives a fresh multi-finish skim coat. Patching a localised area without re-skimming the wall often leaves a visible boundary line where the new plaster meets the old surface, which becomes apparent once painted.

What is the approximate cost of a full house re-skim and ceiling replacement in Redbridge?

Costs vary depending on the number of rooms and the extent of ceiling replacement required. For a mid-terraced or semi-detached period property in Redbridge, a full house re-skim combined with ceiling replacement work typically falls in the range of £1,800 to £3,500 depending on the property size, access, and the condition of existing substrates. We provide free, itemised quotes so you can see exactly what is included.

Do I need to prime new plasterboard before it can be skimmed?

New plasterboard has a highly absorbent paper face that can pull moisture out of the skim coat too quickly, causing the plaster to dry unevenly and become difficult to trowel. A mist coat of diluted PVA bonding agent — typically one part PVA to four parts water — is applied to the board face and allowed to become tacky before the multi-finish skim is applied. This controls the suction and allows the plaster to be worked properly.

How long should I wait before painting newly plastered walls and ceilings in a Redbridge property?

Freshly plastered surfaces should be allowed to dry fully before painting — this typically takes between four and six weeks depending on the thickness of the plaster, ventilation, and ambient temperature. The surface will lighten from a dark pink to a uniform pale grey as it dries. Applying paint too early traps moisture and can cause the finish to bubble or peel. A mist coat of watered-down emulsion applied first helps the paint key to the new plaster correctly.

Will replastering disturb asbestos in a period property in Redbridge?

Properties built before 2000 in Redbridge may contain asbestos in textured coatings such as Artex, in ceiling tiles, or in other building materials. If you are unsure, an asbestos survey should be carried out before any plastering work begins. London Plastering Service can advise you on the appropriate steps to take before we start work, ensuring the project is managed safely and in compliance with current regulations.

Our Plastering Services

Related Plastering Projects in London

If you have a period property in Redbridge or the wider IG1 area with failing lath and plaster ceilings, large wall blow-outs, or walls in need of a full re-skim, London Plastering Service can survey and price the work for you. We carry out ceiling replacements, plasterboard fixing, and full house re-skims across Redbridge. Call us today or request a free quote online.

Call Now

Get a Free Quote

Fastest quote = WhatsApp photos. Form is optional.

Lightning Fast Response

We reply to all enquiries within 60 minutes

Free Site Visit

We'll assess your project at no cost

No Obligation

Receive your quote with zero pressure

Prefer WhatsApp?

Send Message on WhatsApp