Four-stage collage showing bare exposed joists after lath removal (top-left), new 12.5mm plasterboard fixed to ceiling joists with scrim-taped joints (top-right), plasterboard sheets fixed to stairwell walls and ceiling with ladder in position (bottom-left), and completed two-coat multi-finish skim on walls and ceiling ready for decoration (bottom-right)
Borough
Ealing
Service
Full House Re-skim
Duration
3 days
Approx Cost
£900–£1,400
Property Overview
This project took place in a Victorian terraced house in Ealing, West London. Properties of this type — typically built between the 1880s and early 1900s — commonly retain their original lath and plaster ceilings, which can deteriorate significantly over time. This particular home had reached the point where the original ceiling structure was beyond repair and required full removal and replacement with modern plasterboard before a fresh skim coat could be applied to bring the space up to a modern standard.
The Problem
The images clearly show the original lath and plaster ceiling had completely failed. The top-left photo reveals the full extent of the damage: all plaster had been stripped or had fallen away, leaving only the bare timber joists and the original wooden lath strips exposed. Loose electrical cables were also visible hanging between the joists, indicating the property had undergone some rewiring work. The surrounding walls showed heavily worn and patchy plaster with areas of exposed render coat. The stairwell environment made access particularly difficult, and the debris from the failed ceiling had to be cleared before any new work could begin.
Inspection & Scope of Work
The scope of work for this stairwell ceiling replacement and wall re-skim in Ealing covered the following: removal of all remaining lath and plaster debris from the ceiling void; inspection of the exposed timber joists for any signs of structural movement or rot; fixing new 12.5mm tapered-edge plasterboard sheets directly to the ceiling joists using drywall screws at the correct centres to achieve a flat, level substrate; jointing of all plasterboard seams using scrim tape and a bonding compound to prevent cracking at the board joints; application of a PVA bonding wash to the surrounding wall surfaces where old plaster had been cut back or had deteriorated; a full two-coat multi-finish skim applied to the new plasterboard ceiling, comprising a scratch coat to embed and key the surface followed by a finish coat trowelled flat; and a matching two-coat skim applied to the prepared wall surfaces to ensure the walls and ceiling met at a clean, consistent finish. Throughout the project, the stairwell access required the use of a tall telescopic ladder and platform arrangement to allow safe working at height across the full ceiling area.
Preparation Work
Before any plasterboard could be fixed, all remnants of the old lath and plaster ceiling were removed from between and around the joists. Electrical cables visible in the void were carefully moved aside and secured safely out of the working area. The timber joists were inspected and confirmed sound. Existing wall plaster around the perimeter of the stairwell was cut back to firm edges where it had become loose or hollow. All wall surfaces were coated with a diluted PVA bonding solution — approximately one part PVA to four parts water — and left to become tacky before any plaster was applied, ensuring adequate suction control on the porous substrate.
Step-by-Step Plastering Process
With the ceiling joists exposed and the stairwell prepared, new 12.5mm tapered-edge plasterboard boards were lifted into position and fixed to the ceiling joists using 3.5mm drywall screws at 150mm centres along the joists, with each screw head driven just below the board surface without breaking the paper face. All board joints were taped with fibreglass scrim tape, which was then bedded into a thin layer of bonding compound and allowed to dry. Once the boards were fully secured and the joints set, the entire ceiling received a scratch coat of British Gypsum Multi-Finish plaster, applied at approximately 2–3mm thickness and cross-scratched to create a mechanical key. A second finishing coat was then applied and trowelled progressively as the plaster stiffened, using a clean steel float to achieve a flat, smooth surface. The same two-coat Multi-Finish process was applied to the stairwell walls, which had been PVA-primed the day before. The final bottom-right image in the collage shows the completed skim — the walls and ceiling displaying an even, consistent brown-coat finish ready for decoration. Given the raking geometry of the stairwell ceiling and the difficulty of working at height on a pitched staircase, the plastering was completed in careful sections to maintain a wet edge throughout.
Challenges Encountered
The primary challenge on this project was the stairwell setting itself. Stairwell ceilings follow the pitch of the staircase, meaning the ceiling height varies from one end to the other, making it impossible to use standard scaffolding or hop-ups. The plasterer had to work from a tall telescopic ladder — visible in the bottom-left image — while handling and fixing full sheets of 12.5mm plasterboard overhead. Maintaining consistent board fixing and achieving flat, even joins across a raking ceiling without a stable flat-floor platform requires considerable experience and physical control, particularly when applying wet plaster at full arm extension.
Our Solution
To overcome the access challenge, a combination of a tall telescopic ladder and a purpose-built stair platform was used to provide safe and stable working positions at each section of the pitched ceiling. Plasterboard sheets were cut to the correct raking angle before being lifted into position, reducing the time spent making adjustments overhead. The skim was applied in manageable sections — working from the top of the stairwell down — to ensure a continuous wet edge was maintained and no cold joins were left in the finish coat. The PVA priming of wall surfaces the day before allowed the plaster to be applied at a controlled rate without being drawn in too quickly by the porous old render beneath.
The Finished Result
The bottom-right image of the collage shows the completed stairwell after skimming — walls and ceiling both carrying an even, warm-toned brown finish coat that is ready for painting once fully dried. The new plasterboard ceiling sits flat and level against the pitch of the staircase, with no visible board joints or scrim lines. The wall plaster meets the ceiling at a consistent, clean line. What had previously been an exposed, debris-strewn stairwell with a completely failed Victorian ceiling is now a smooth, structurally sound surface that will accept decorator's paint or lining paper directly.
Client Outcome
The homeowner in Ealing was able to proceed with decorating their stairwell shortly after the plaster had dried and cured — typically 7–10 days for a full two-coat skim on new plasterboard. The replacement ceiling eliminated the risk of further plaster falls in the stairwell and resolved the unsightly, deteriorated appearance of the space. With the walls and ceiling now skimmed to a consistent standard, the stairwell required only a mist coat of emulsion followed by the client's chosen finish paint, completing what had been a long-standing maintenance issue in the property.
Why Choose London Plastering Service
Replacing a lath and plaster ceiling in a stairwell is not a task suited to a general builder or a DIY approach. The combination of working at height on a raking pitch, handling full sheets of plasterboard overhead, achieving flat board joints on a sloped surface, and then applying a two-coat wet plaster finish demands both plastering expertise and safe working-at-height practice. An incorrectly fixed board — under-screwed or with poor edge support — can sag and crack within months of decoration. A plasterer with experience of Victorian terraced properties in Ealing understands how to manage suction rates on old substrates and how to achieve a finish coat that bonds correctly to new plasterboard.
Cost Factors & Project Timeline
This full house re-skim project in Ealing was completed in approximately 3 days. The estimated cost for this type of work typically ranges £900–£1,400, depending on the size of the area, condition of the existing substrate, and level of preparation required. As a victorian terraced house, the project required specific considerations for access, dust management, and surface preparation typical of this property type in Ealing.
"The team stripped out the old lath ceiling in the stairwell, fixed new plasterboard and skimmed the whole lot in just a few days. The finish on the ceiling and walls is completely flat — you'd never know there was bare timber showing up there before. Really pleased with how clean they left the site each day given how difficult that stairwell access was."
— Daniel F.
Frequently Asked Questions
How do I know if my Victorian lath and plaster ceiling in Ealing needs replacing rather than repairing?
If you press gently on the ceiling and it feels springy or hollow in multiple places, or if large sections of plaster have already fallen, a full replacement is almost always the more cost-effective route. Patch repairs to lath ceilings can work for isolated areas, but when more than a third of the ceiling is unsound, replacing the whole ceiling with new 12.5mm plasterboard and a skim coat gives a far more stable and lasting result.
How long does a stairwell ceiling replacement and re-skim take in an Ealing property?
A stairwell ceiling replacement — including stripping the old lath, fixing new plasterboard and completing a two-coat skim — typically takes 2 to 3 days depending on the size of the stairwell and the number of wall surfaces being re-skimmed at the same time. Access in a stairwell is more time-consuming than a standard room because the ceiling is raked and working at height requires careful repositioning of ladders and platforms throughout.
Can I decorate straight after the new plaster has been applied in my Ealing home?
No — new plaster on plasterboard needs adequate time to dry and cure before any paint is applied. In a well-ventilated stairwell, this is typically 7 to 10 days for a two-coat multi-finish skim. The first coat of paint applied to new plaster should always be a diluted mist coat — roughly 80% emulsion to 20% water — to allow moisture to escape evenly. Applying neat emulsion too early can cause the plaster to crack or the paint to peel.
What is the approximate cost of replacing a lath and plaster ceiling in a stairwell in Ealing W5?
For a standard stairwell ceiling replacement in an Ealing Victorian terraced house — including lath removal, new 12.5mm plasterboard fixed to joists, scrim tape jointing, and a two-coat multi-finish skim — you should expect to budget between £900 and £1,400 depending on the ceiling area, ceiling height and whether the surrounding walls also require re-skimming. Stairwells carry a modest access premium over flat-ceiling rooms due to the additional time required for safe working at height.
Do I need to move out of my Ealing home during a ceiling replacement and re-skim?
In most cases, no. Ceiling replacement work generates dust and debris during the stripping phase, so it is advisable to cover furniture and seal off doorways in adjacent rooms. However, the rest of the property remains habitable throughout. Our team clear the site at the end of each working day. For stairwell work specifically, access to the stairs will be temporarily restricted during plastering, so this should be factored into your planning if the staircase is the only route between floors.
Will new plasterboard on a Victorian ceiling be as good as the original lath and plaster finish?
Modern 12.5mm plasterboard fixed correctly to the ceiling joists and skimmed with two coats of Multi-Finish plaster produces a flat, hard-wearing surface that outperforms old lath and plaster in several practical ways. It is lighter, more consistent, does not suffer from the key failure that causes lath ceilings to drop, and provides a better base for modern paints and wallpapers. Many Ealing homeowners also choose to add acoustic or thermal insulation to the ceiling void before boarding, which is not possible with the original construction.
Does London Plastering Service cover all areas of Ealing and West London for ceiling replacement work?
Yes — we cover the full Ealing borough including W5, W7, W13 and the surrounding West London areas. We carry out ceiling replacement and re-skim projects across Victorian and Edwardian terraced properties throughout the borough. To arrange a free on-site assessment of your ceiling, call us or use the contact form and we will confirm availability in your area within 24 hours.
If you have a failed lath and plaster ceiling or deteriorated stairwell walls in an Ealing property, London Plastering Service can assess and replace the ceiling and re-skim the walls efficiently. We cover all of W5 and the surrounding West London boroughs. Call us today for a free, no-obligation quote and we will arrange a convenient site visit.